露脸丨91丨九色露脸 I 国产成人精品午夜福利a I 欧美日韩一区二区三区69堂 I 色琪琪av中文字幕一区二区 I 日韩欧美特级片 I 精品国产一区在线 I 午夜在线91 I 亚洲男人的天堂一区二区 I 日日操夜夜揉 I 国内精品国产三级国产在线专 I 春色校园亚洲愉拍自拍 I 中文在线8新资源库 I av日韩网 I 亚洲综合一区二区 I 一级成人av I av不卡网 I 色视频在线免费看 I 潮喷大喷水系列无码 I 91色国产在线 I 国产a一区 I 欧美肥老太牲交视频 I 高hnp多人 I 亚洲欧洲成人精品av97 I 国产精品国产高清国产av I 性欧美老人牲交xxxxx视频 I 国产精品嫩 I 欧美成人dvd在线视频 I 国产精品美女久久久9999 I 美女极度色诱视频 I 亚洲成人黄色小说 I 日韩女同在线 I 九色精品免费永久在线 I 亚洲图片 制服诱惑 I 亚洲国产日韩美 I 亚洲精品电影久久久

Shandong Tianyu Construction Machinery CO.,LTD.
Add:Qihe Economic Development Zone, Shandong Province
Tel:+86-534-5678900
Fax:+86-534-8997399
E-mail:tyjsjx2002@163.com
Postcode:251100
WebSite:http://m.bykm.com.cn
Alibaba:https://sdtyjx.en.alibaba.com
Company news

Shandong tianyu 2016 low-voltage switchgear supervision and inspection passed the acceptance smoothly

From December 14 to 15, 2016, the China quality certification center supervised and inspected the low-voltage switchgear power cabinet produced by our company. This inspection is a routine supervision and inspection.

Inspection objective: to evaluate the company's ability to ensure the consistency between the mass-produced certified products and the qualified samples from type tests. Scope of inspection: low-voltage switchgear - power cabinet produced by the company

Inspection basis:

1. Relevant national laws, regulations, administrative normative documents, etc

2. Product certification rules: cnca-c03-01:2014: CQC- c0301-2014

3. Factory inspection requirements and/or plant quality assurance capability requirements

4. Type test report or confirmed product description report, etc

The surveillance audit by China quality certification center sent chuan-guo shi and zhi-jun jia two experts group, chuan-guo shi ren the inspection team leader, the supervision and inspection of the time for two days 14 and 15.

Inspection team to our company's management, the relevant departments of the attendees at the meeting, at the end of the first, to the quality inspection, supply, production, technical data, the key to verify factory information provided by the company, the procurement and key-module control, production process control, regular inspection and verification, inspection certificate of testing instruments and equipment account and identifying, the verification of the unqualified item, last time, the control of non-conforming product certification, product changes and consistency control product consistency check, a prototype for the on-site inspection and test, the comprehensive inspection on the CCC certificate and sign audit. To the quality manual, program files management system documents checked and consult, evaluate whether the organization management system running continue to meet all the requirements of the audit standard, system operation is sustained and effective.

Due to sufficient preparation for the inspection materials and all aspects of work, the two-day supervision and verification work passed the acceptance smoothly.

Inspectors' evaluation:

Comprehensive judgment of factory inspection: all conformance items passed the factory inspection.